Uncategorized

Bridge Nearing Completion

By October 11, 2019

Excited to be one step closer to completing this trail connection just south of Trinity Park on the East Bank of the Trinity River. This highly anticipated bridge will add to more than the 70 existing miles of trails.

Watch a video of the construction here.

Lake Current Level Conservation Level* Level Difference**
Arlington 542.31 550.00 -7.69
Benbrook 690.56 694.00 -3.44
Bridgeport 828.41 836.00 -7.59
Cedar Creek 318.55 322.00 -3.45
Eagle Mountain 643.83 649.10 -5.27
Lake Worth 591.55 594.00 -2.45
Richland-Chambers 313.03 315.00 -1.97
*Conservation Level: The permitted level of water an entity is allowed to hold in a lake. Any amount above the conservation level is used for the temporary storage of flood waters and must be released downstream.
**Difference: Amount above or below conservation level.
For more information read our daily reports or the TRWD Lake Level Blog.

Check out the TRWD OneRain portal for a visualization of this information and more.

Stay connected with TRWD!

Sign up for our newsletter!

Newsletter Sign Up